Hidden insulation: what evidence should you prepare for an EPB certificate in Wallonia?

Invoices and building work photographs: organise evidence of hidden insulation before the assessor's visit, without assuming it will be accepted.

# Hidden insulation: what evidence should you prepare for an EPB certificate in Wallonia? To document hidden insulation, gather invoices, building work photographs and technical documents, then organise them by building element. Send them to the assessor before the visit. The assessor will determine what can be used under the Walloon method: finding a file does not guarantee that every document will be accepted or that the rating will improve. ## Why might insulation be recorded as unknown? In her [answer of 6 January 2026 to the Walloon Parliament](https://www.parlement-wallonie.be/pwpages?iddoc=140547&p=interp-questions-voir&type=28), the Minister for Energy explains that, without visual confirmation or available evidence, the assessor must record insulation as unknown and apply default values. That entry does not, on its own, demonstrate that insulation is absent. Your recollection of the work does not prove a precise thickness either. The answer states that supporting documents can be presented before or during the visit and that assessors do not dismantle elements themselves. Do not open up a building element without discussing whether the inspection would be useful and obtaining a quotation for the intervention and making good. ## Which documents should you look for first? The [SPW details the documents to prepare](https://energie.wallonie.be/home/performance-energetique-des-batiments/batiments-residentiels/achat-vente-location/outils/visite-du-certificateur-les-documents-a-preparer.html). It distinguishes plans useful for the visit from acceptable evidence, including certain paid original invoices for clearly described work, complete construction files and architects' statements subject to conditions. A statement drawn up today is not automatically sufficient. Our method for organising the documents is to prepare a sheet for each area: main roof, extension, garden-facing wall or floor above the garage. - Identify the building element and the work concerned. - Record the known or reported date, making the distinction clear. - Note the material and thickness only where documents establish them. - Link the corresponding invoices, photographs and technical documents. - Flag gaps or contradictions rather than filling them in. An invoice for the extension does not document the whole roof. A quotation describes a proposal; a product sheet describes a material. Neither, on its own, demonstrates installation in a specific building element. Keep conflicting documents and ask the relevant contractor for clarification. ## What should you photograph before the finishes are installed? The photographic file described by the SPW must make it possible to identify the building, the element, the presence and type of insulation, and its thickness where this can be established. Combine an overall view with close-ups of the installed insulation. A label alone does not show where the material was installed. Keep the originals and add location details in a separate note. If the finishes are already in place, look for photographs kept by the contractors before considering opening anything up. This organisation prepares the assessment; it does not replace the assessor's judgement. ## Which questions arise before a sale? ### Does an invoice guarantee a better EPB rating? No. Its content and connection to the building element must be examined. Having a document does not guarantee that it can be used for every characteristic or that the rating will change. ### What if the thickness remains unknown? State that it is unknown and present the available evidence. Do not infer a thickness from a recollection or a photograph that does not allow it to be measured. ### Should a finished roof be opened up again? Not without a preliminary assessment. Discuss possible inspections with the assessor, then ask a professional to quote for any intervention and making good. To prepare the other documents, consult our [guide to preparing a sale](https://youhome.immo/journal/preparer-vente-maison-wallonie/). For a renovated house in the Province of Liège, you can [request your valuation report](https://youhome.immo/en/valuation/request/). The file should make the work understandable while keeping unproven information clearly identified.